The first floor level of The Coney Island Gospel Assembly was completely submerged under sea water on October 29th 2012 as a result of Hurricane Sandy. 9500 square feet of the church facilities where they served thousands of residents of the immediate community and all that was in it perished. Classrooms, storage rooms, pantry, kitchen, caretaker room, fan room boiler room, reception area and main auditorium all gone. Through the last four years the Pastors, leaders and congregants were praying and waiting that by God's grace they would be able to obtain the necessary funding to restore the building where they could once again dedicate themselves to helping and assisting the community. The prayers of this church and those of the many donors throughout the nation that prayed for their donations to be turned into the much needed funding for the restoration of churches devastated by Hurricane Sandy came together in the throne of the almighty. By God's grace and for the glorification of His Son Jesus Christ Samaritan Purse of the Billy Graham and Franklin Graham ministries approved the funding and the work to begin immediately to make this church facilities whole again and ready to continue to serve the Lord by serving their neighbors. Call Me First Home Improvement LLC is honored to have been selected to make this project happen and to be part of the team that the Lord is using for His eternal purpose.
The first floor level of The Coney Island Gospel Assembly was completely submerged under sea water on October 29th 2012 as a result of Hurricane Sandy. 9500 square feet of the church facilities where they served thousands of residents of the immediate community and all that was in it perished. Classrooms, storage rooms, pantry, kitchen, caretaker room, fan room boiler room, reception area and main auditorium all gone. Through the last four years the Pastors, leaders and congregants were praying and waiting that by God's grace they would be able to obtain the necessary funding to restore the building where they could once again dedicate themselves to helping and assisting the community. The prayers of this church and those of the many donors throughout the nation that prayed for their donations to be turned into the much needed funding for the restoration of churches devastated by Hurricane Sandy came together in the throne of the almighty. By God's grace and for the glorification of His Son Jesus Christ Samaritan Purse of the Billy Graham and Franklin Graham ministries approved the funding and the work to begin immediately to make this church facilities whole again and ready to continue to serve the Lord by serving their neighbors. Call Me First Home Improvement LLC is honored to have been selected to make this project happen and to be part of the team that the Lord is using for His eternal purpose.
Photo Gallery Of Work In Progress
The first payment installment was received on April 26th to begin the work of drafting the scope of work for submission and filing with the Department of Buildings of the City of New York, begin the roof repairs, purchase first truck of materials and begin to frame a small storage, room to store tools and materials for job. The first day of physical work began on May 16th, 2016. The work on this phase included: Roof Repairs, Framing, drywall, plastering, painting, electrical and lighting of the tool storage room and pantry room, drafting work scope for submission to the Department Of Buildings of the City Of New York.
Engineer Drafting Scope Of Work For Submission to the Department Of Buildings
Several Truck Loads Of Materials And Supplies
Let the fun begin...
Roof Repairs
Tool Storage Room
Framing. Drywall, Electrical, Lighting, Plastering, Sanding, Painting, Cabinet Installation, Finish Work
Major Electrical Installations
Electriccian running lines for lights and outlets in main room area, kitchen, classrooms, bathrooms, boiler room, fan room, pantry room etc.
The Men's Bathroom
Men's bathroom progress which includes new framing, new durock, and drywall, new wall tiles from floor to ceiling, new ceiling and lighting, electrical and plumbing upgrade, new shower, new shower panel, new shower doors. new commode, new urinal, sinck installation, faucets and mirrors, new stalls, new hand dryer, flooring, plastering and painting.
Men's bathroom progress which includes new framing, new durock, and drywall, new wall tiles from floor to ceiling, new ceiling and lighting, electrical and plumbing upgrade, new shower, new shower panel, new shower doors. new commode, new urinal, sinck installation, faucets and mirrors, new stalls, new hand dryer, flooring, plastering and painting.
Women's Bathroom
Women's bathroom progress which includes new framing, new durock, and drywall, new wall tiles from floor to ceiling, new ceiling and lighting, electrical and plumbing upgrade, two new commodes, two sinck installations, faucets and two mirrors, new stalls, new hand dryer flooring, plastering and painting.
Women's bathroom progress which includes new framing, new durock, and drywall, new wall tiles from floor to ceiling, new ceiling and lighting, electrical and plumbing upgrade, two new commodes, two sinck installations, faucets and two mirrors, new stalls, new hand dryer flooring, plastering and painting.
Framing Work and Drywall in Main Area
Boiler Room
Dismateling Old boiler and components and installation of new boiler units
and installation of ductwork and gas lines.
Dismateling Old boiler and components and installation of new boiler units
and installation of ductwork and gas lines.
kitchen Renovation
Kitchen renovation begin with stipping old wood framing and replacing with metal framing required by FDNY and DOB fire code. All kitchen equipment will soon be delivered which includes, commercial refrigerator, freezer, Pizza table, range, hood, fire suppression system over range, grease trap, the renovation also includes all electrical and plumbing upgrades as well as lighting, plaster and painting and flooring.
Kitchen renovation begin with stipping old wood framing and replacing with metal framing required by FDNY and DOB fire code. All kitchen equipment will soon be delivered which includes, commercial refrigerator, freezer, Pizza table, range, hood, fire suppression system over range, grease trap, the renovation also includes all electrical and plumbing upgrades as well as lighting, plaster and painting and flooring.
Outside Condenser Units
A steel platform suspended from the brickwall was built 8 feet above ground to hold the 3 new condensers for the first level AC. the job included the installation of 3 new electrical boxes, copper pipe tubing running to the inside units, charging the units with freeon, painting of the platform and testing of the units.
A steel platform suspended from the brickwall was built 8 feet above ground to hold the 3 new condensers for the first level AC. the job included the installation of 3 new electrical boxes, copper pipe tubing running to the inside units, charging the units with freeon, painting of the platform and testing of the units.
Entrance Steps
Replacement of entrance steps, beautiful and professional job!
Replacement of entrance steps, beautiful and professional job!
Four Classrooms and The Fan Room
All rooms were framed, electrical work performed for switches, outlets and new lighting, drywall installed, plaster and sanding, new doors, new ceilings, painting to be performed, flooring.