Naomi AME Zion Church
Hurricane Sandy truly destroyed the community facilities of Naomi AME Zion Church. Through the last four years the Pastors, leaders and congregants were praying and waiting that by God's grace they would be able to obtain the necessary funding to restore the building where they could once again dedicate themselves to helping and assisting the community. The prayers of this church and those of the many donors throughout the nation that prayed for their donations to be turned into the much needed funding for the restoration of churches devastated by Hurricane Sandy came together in the throne of the almighty. By God's grace and for the glorification of His Son Jesus Christ Samaritan Purse of the Billy Graham and Franklin Graham ministries approved the funding and the work to begin immediately to make this church facilities whole again and ready to continue to serve the Lord by serving their neighbors. Call Me First Home Improvement is honored to have been selected to make this project happen and to be part of the team that the Lord is using for his eternal purpose.
Hurricane Sandy truly destroyed the community facilities of Naomi AME Zion Church. Through the last four years the Pastors, leaders and congregants were praying and waiting that by God's grace they would be able to obtain the necessary funding to restore the building where they could once again dedicate themselves to helping and assisting the community. The prayers of this church and those of the many donors throughout the nation that prayed for their donations to be turned into the much needed funding for the restoration of churches devastated by Hurricane Sandy came together in the throne of the almighty. By God's grace and for the glorification of His Son Jesus Christ Samaritan Purse of the Billy Graham and Franklin Graham ministries approved the funding and the work to begin immediately to make this church facilities whole again and ready to continue to serve the Lord by serving their neighbors. Call Me First Home Improvement is honored to have been selected to make this project happen and to be part of the team that the Lord is using for his eternal purpose.
Photo Gallery of Work In Progress
The first payment installment was received on May 25th to begin the work of drafting the scope of work for submission and filing with the Department of Buildings of the City of New York, begin the fabrication and installation of windows and the installation of new ten tons central air conditioning system for the first level facilities.
Engineer Drafting Plans For Filing With The Building Department
Windows Delivery And Installation
Central Air System Delivery And Installation Lower Level
Below the photos show the work of performed in the installation of a 10 ton Central Air Conditioning System for the first level.
The system includes two air handlers, two air compressors, two outside condensers, all ductwork and insulation fabricated
on premises and custom installation. The outside condensers were set on steel frames attached 8 feet above ground, to prevent
loss of equipment in the future in the event of another flood.
Steel Platform Delivery and Installation
Steel platform was fabricated and delivered to the jobsite. In the photos, welders are assembling it and welding it together for proper installation. Platform is designed to hold the 800 LBS condenser eight feet above ground in the event that the water rises again in Coney Island.
Central Air Conditioner Units, Condenser and Air Handler Delivery and Installation. Upper Level
Photos below show the delivery and installation of the outside condenser and the air handler for the upper level central air conditioning. A crane lifted the units one to the steel platform and the other to the second floor level.
This work took a lot of preparation and strategy to set both units in their respective places.
GREAT WORK BY THE CREW!
Photos below show the delivery and installation of the outside condenser and the air handler for the upper level central air conditioning. A crane lifted the units one to the steel platform and the other to the second floor level.
This work took a lot of preparation and strategy to set both units in their respective places.
GREAT WORK BY THE CREW!
Flooring Delivery and Installation
Below is a gallery of photos showing the work progress of the installation of
3000 square feet of ceramic tiles over concrete.
Concrete floor had to be leveled and repaired before installation of new flooring
General Construction
Framing, drywall, plaster, sanding, electrical, flooring, new doors, new offices, Kitchen flooring